One Complete Free Report - No Credit Card

Get your full construction document
analysis, free

Every new account gets one complete PX-360 report - every finding we can verify, with sheet references and a downloadable PDF. No payment details required.

Why sign in first?

  • Your report is tied to your verified email, so only you can open it
  • Reopen or re-download your report any time, from any device
  • We email you when the analysis finishes
  • One free report per verified email - your trial is never consumed by a failed run

You'll come straight back here after verifying your email.

What a PX-360 report looks like

Three findings from an example report, showing the kind of issue the analysis surfaces before bid.

Illustrative example. These are sample findings created to demonstrate report format and detail. They are not from a customer document, and no customer drawings or project information appear anywhere on this page.

MECHANICAL / STRUCTURALCoordination ConflictHIGH RISKM-201 / S-301

Mechanical duct routing appears to conflict with structural framing at the indicated location.

Why it matters
Potential coordination issue requiring clarification before installation.
Suggested action
Confirm routing and clearance requirements with the design team.
ELECTRICALMissing InformationMEDIUM RISKE-102

Panel schedules referenced in the electrical drawings are not included in the bid set.

Why it matters
Contractors cannot accurately price electrical distribution without panel schedules.
Suggested action
Request the missing panel schedules via RFI before bid submission.
ARCHITECTURALScope GapHIGH RISKA-310 / Spec 09 65 00

Finish schedule references floor products not defined in the specifications.

Why it matters
Undefined materials leave pricing open to assumption and create change order exposure.
Suggested action
Confirm finish products and specification sections with the design team.

Your report covers every issue we can verify in your documents, not just three.