Seven Analysis Modes

Analysis built from real construction experience

Seven analysis modes designed to assist experienced estimators, preconstruction managers, and document reviewers in evaluating bid packages. Results are informational and should be independently verified.

Findings Dashboard
24 findings
HIGHDuct conflicts with structure — L3Coordination
HIGHSpec Section 09 21 23 not referencedMissing Info
MEDFinish schedule incomplete — L2Scope Gap
LOWDetail 7/A-501 not includedDesign Gap
Organized by category, discipline, and risk level
Seven Analysis Modes

Seven modes. One thorough review.

Each mode targets a specific risk area of your bid package. Run one — or run them all together.

01

Design Gap Review

Identifies missing details, undefined assemblies, incomplete schedules, and information gaps across all disciplines.

  • Missing dimension callouts
  • Incomplete door or finish schedules
  • Undefined assemblies
  • Referenced details not included
02

Coordination Review

Detects conflicts between disciplines: mechanical vs structural, electrical vs architectural, technology vs security.

  • Ductwork vs structural conflicts
  • Electrical clearance issues
  • Ceiling coordination conflicts
  • Furniture vs power location mismatches
03

Constructability Review

Evaluates whether designs can be built efficiently with standard construction methods and reasonable sequencing.

  • Access and staging concerns
  • Construction sequence conflicts
  • Material availability issues
  • Installation clearance problems
04

Preconstruction Risk Review

Surfaces risks that experienced preconstruction managers would flag during bid package evaluation.

  • Budget exposure areas
  • Schedule risk factors
  • Contractor assumption areas
  • Insurance and liability gaps
05

Scope Gap Review

Identifies areas where scope responsibility between trades is unclear or undefined.

  • Conflicting finish callouts
  • Undefined trade boundaries
  • Missing scope definitions
  • Overlapping specifications
06

Bid Package Completeness

Evaluates whether the document set is complete enough for contractors to provide accurate pricing.

  • Missing specification sections
  • Incomplete bid forms
  • Undefined alternates
  • Missing phasing instructions
07

Change Order Exposure

Flags issues that commonly result in change orders based on real-world construction experience.

  • Missing equipment locations
  • Conflicting specifications
  • Unclear scope divisions
  • Incomplete details

Run all seven together

Combine every mode for a complete review of your bid package — findings organized by discipline, category, and risk level.

Start your first analysis
Example Output

What you actually get when you run an analysis

Every finding arrives with the practical context an experienced reviewer would attach: the document reference, why it matters, what it could cost, and a draft RFI you can submit.

HIGH RISKCoordination Conflict

Ductwork conflicts with structural framing — Level 3

Mechanical ↔ Structural · M-501.2 · S-301 · Grid line C

The mechanical layout routes 24" ducts through the same bay as a deep structural beam. Left unaddressed, this becomes a guaranteed RFI during submittals and a likely duct reroute.

Typical exposure: $8K–$15K change order plus 1–2 weeks of submittal delays.

Suggested RFI

“Confirm the duct route at grid line C, Level 3. Is a beam penetration, duct resize, or reroute intended?”

HIGH RISKMissing Information

Spec Section 09 21 23 not referenced on drawings

Architectural ↔ Specs · Div 09 · A-420 · A-421

The gypsum assembly specification is never keyed on the plans. Bidders must guess which walls get which assembly — and guesses get priced into contingencies or claimed later.

Undefined assemblies are a classic change order trigger during closeout walkthroughs.

Suggested RFI

“Provide a gypsum assembly key plan showing where each Section 09 21 23 assembly applies.”

MEDIUM RISKScope Gap

Finish schedule incomplete — Level 2 corridor

Flooring ↔ Drywall · A-930 · Finish Schedule

Corridor base, cap flashings, and transition strips are listed as “TBD.” Trade boundaries between flooring and drywall are unclear, so both subs will exclude the work.

Unpriced scope surfaces as a gap nobody bid — someone pays for it, usually after negotiation.

Suggested RFI

“Complete the Level 2 corridor finishes and clarify which trade furnishes and installs transitions.”

Bid timelines are compressed

Estimators get days — sometimes hours — to review hundreds of pages. PX360 helps you focus on what matters.

Experience isn't on every project

The issues senior reviewers know to hunt for are organized and surfaced for your whole team.

Issues cost less before the bid

A question at bid time is an RFI. The same question in the field is a change order.

Example findings shown for illustration. PX360 results are informational and require independent professional verification.

Coverage

Works across all project types

The analysis methodology focuses on document relationships and coordination — not building type assumptions.

Hospitals & Healthcare
Medical Offices
Laboratories
K-12 Schools
Universities
Daycare Facilities
Apartments & Multifamily
Hotels
Office Buildings
Municipal Buildings
Fire & Police Stations
Industrial Facilities
Manufacturing
Data Centers
Retail
Mixed-Use Developments
Government Buildings

Not Ready to Upload a Project Yet?

Get a Sample PX360 Analysis

See what a PX360 findings report looks like — organized findings, document references, risk categories, and suggested next steps. We'll only use your email for PX360 information you request.

07Run The Analyses

Put Every Analysis to Work on Your Bid Set

Point PX360 at your documents and run the review modes your project needs.

Seven analysis modes — one coordinated review of your package.

Design GapsCoordinationScope Gaps
PX360 ReviewFindings Report

PX360 findings are informational and require independent professional verification before use in bid, pricing, or construction decisions.